Schematic
Tower-A_MEP_Coordination.rvt
START OF THE RUN
Pump P-101 · DN100
Where the run begins: a pump, the first pipe, any fitting.
END OF THE RUN
Every end downstream
With no end, every branch downstream of the start is drawn. Pick an end for one run.
FOLLOW THROUGH
Port 1 · N1 · DN100 (upstream)
Port 2 · N2 · DN100
Untick a port of the start that should not be followed (the way back upstream, for one).
SHEET
Sheet number prefix
Sheet title
DRAWING
Flow arrows
Sizes on the lines
Valve and accessory symbols
Part letters
Draw the branches too
Equipment boxes
Bill of material and notes
NOTES
Open the PDF after export
Open the drafting view after creating it
Draw reads the run and shows the sheet. Export PDF prints it through Revit in the title block picked (a plain page without one); Create View adds the drafting view and its sheet to the model in one undoable transaction.
ELEMENTS READ
—
PIPES DRAWN
—
LENGTH
—
VALVES / LEFT OUT
—
ROWS / MACHINES
—
SHEET PREVIEWThe content area of the sheet, exactly as the PDF page and the drafting view carry it. Click a piece to show it in Revit.
A flow schematic from the model
Pick where the run starts, optionally where it ends, then Draw. The sheet appears here as it will print.
BILL OF MATERIAL