Guideline
PINNED
BIM Execution Plan v4.2.pdfPDF · 2.4 MB · rev 2026-06-30
Naming_Convention.mdMarkdown · editable in place
LIBRARY · \\server\BIM\Standards
MEP Modeling Guideline.pdfPDF · 8.1 MB
Parameter_Matrix.xlsxExcel · inline preview
QA Checklist Template.docxWord · extracted text
Workset Standard.pdfPDF · 1.2 MB
Titleblock_Layout.pngImage
Clash_Matrix_Notes.mdMarkdown
Library rescanned 08:12 · 2 folders · 34 files indexed
Preview
Edit
Notes ·
Find in document
100% · page 3 / 41

BIM Execution Plan — v4.2

Section 3 · Model Structure & Worksets — IcZ.PdfView (PDFium render) · annotations shown

3.1 Workset partitioning

Model elements shall be assigned to worksets by discipline and system function, following the schedule in Appendix B. Link instances occupy dedicated ZZ_LNK_* worksets and are never left on a working set.

3.2 Level of Information (LOI)

Every deliverable model is scored against the firm's Model Checker LOI ruleset before issue. Elements failing mandatory parameters are corrected — no waiver is granted for SPEC_* fields.

  • SPEC_SYSTEM, SPEC_SIZE and SPEC_QUANTITY written by the QAQC pipeline
  • Openings coordinated through the MEP Opening workflow, one marker per crossing
  • Exported IFC typing driven by the classification table, not by hand

3.3 Issue procedure

Weekly issues run through the transmittal tool with the project profile; the sheet index accompanies every package.

redline · check against rev C02