BIM Execution Plan — v4.2
3.1 Workset partitioning
Model elements shall be assigned to worksets by discipline and system function, following the schedule in Appendix B. Link instances occupy dedicated ZZ_LNK_* worksets and are never left on a working set.
3.2 Level of Information (LOI)
Every deliverable model is scored against the firm's Model Checker LOI ruleset before issue. Elements failing mandatory parameters are corrected — no waiver is granted for SPEC_* fields.
- SPEC_SYSTEM, SPEC_SIZE and SPEC_QUANTITY written by the QAQC pipeline
- Openings coordinated through the MEP Opening workflow, one marker per crossing
- Exported IFC typing driven by the classification table, not by hand
3.3 Issue procedure
Weekly issues run through the transmittal tool with the project profile; the sheet index accompanies every package.
redline · check against rev C02